Skip to content
Quotation deskQuotation within 24 hours of a complete enquiry.Send an enquiry

08

Renewable Energy

Solar parks and balance of system

Generation equipment and the balance of system that surrounds it, supplied to solar park and rooftop EPC schedules.

What we supply

10 standing lines in this category.

  • Monocrystalline PV modules, TOPCon and bifacial
  • String and central inverters
  • Module mounting structures, fixed-tilt and tracker
  • DC cable, MC4 connectors and string combiner boxes
  • Earthing, lightning protection and site SCADA
  • HT and LT power cables, copper and aluminium
  • Data, control and communication cables
  • HDPE pipes, conduits and cable protection
  • Safety equipment, PPE kits and site signage
  • Hand and power tools, installation hardware

Who buys it

Sectors that consolidate this category.

How it is supplied

Lead time and availability.

Indent and project supply
Sourced against confirmed order from verified OEMs and authorised channel partners. Lead times confirmed in writing at quotation stage, never estimated verbally.
Stock-backed lines
Selected fast-moving lines held against demand. Quotation the same day, dispatch within 4 to 5 working days of a confirmed order.

Compliance that applies

What is checked before this category is dispatched.

  • 01BIS and ISI marked products where certification is mandatory
  • 02Building materials to relevant IS codes and NBC requirements
  • 03OEM warranty passed through in writing on every invoice

To get a quotation in 24 hours, send us

A complete enquiry.

  1. 01Item description, specification or OEM part number
  2. 02Quantity and any phasing across deliveries
  3. 03Delivery location and PIN code
  4. 04Required-by date
  5. 05GSTIN and billing entity for the proforma

Enquire about renewable energy.

The enquiry form opens pre-scoped to this vertical. Add the specification, quantity and delivery PIN code and you have a complete enquiry.

Request a quotation

Procurement as a Service (PaaS) · Gurugram

One purchase order covers this and the other seven.

Consolidating categories removes the vendor onboarding, the separate inspection standards and the question of who to chase.

See all eight verticals